The drawing is not the contractor's to sell
Even a paid relationship with the sub does not move copyright in the architect's set. The protocol collects takeoff tables and rationale, not the sheet.
Estimating · takeoff · change orders
Estimator reasoning, quantity takeoff, and change-order narratives from specialty electrical and construction contractors, without collecting copyrighted plan sets.
The bid is not the plan. The bid is an estimator deciding what the plan implies: homeruns, panel schedules, labor class, and which note is a change waiting to happen. Plans are copyrighted and usually the GC's. We do not collect plan sets. Contractor Estimating & Takeoff Data is the reasoning and the structured quantities the contractor is paid to record.
That is the difference between a document-understanding demo and a workflow a precon team recognizes. Pair it with Invoice & PO Extraction Corpora when the question is pay-app math, and with Multimodal Document Understanding when the model must read a table the contractor already extracted rather than a stolen drawing.
Why it stays scarce
01
Even a paid relationship with the sub does not move copyright in the architect's set. The protocol collects takeoff tables and rationale, not the sheet.
02
Accubid, ConEst, and spreadsheets do not emit a clean public format. The contractor exports a structured recap because we pay for the accepted recap.
03
An NEC citation without a code year and a jurisdiction is a hallucination waiting to happen. Rows that omit them fail QA when the SOW required them.
04
The text is often a dispute. We keep the contractor's claim and the stated basis, and we do not relabel it as an agreed fact.
What we collect
Assemblies, units, labor class, and the assumption attached to each quantity.
Inclusions, exclusions, allowances, and the risk the estimator flagged.
The question, the cost driver, and whether it was a design gap or a means-and-methods choice.
Pay-app and PO fields. See Invoice & PO Extraction Corpora.
Representative schema
This is the shape we scope on a call. A signed order can add or remove fields. It is not a claim that every historical file already contains every column.
| Field | Type | Notes |
|---|---|---|
| estimate_id | string | Internal. Project nicknames that identify an owner are generalized. |
| trade | enum | electrical, low_voltage, fire_alarm, concrete, finishes. Scope is set in the SOW. |
| assembly | object | Name, unit, quantity, labor class. |
| assumption | string | What the estimator assumed because the sheet was silent. |
| code_ref | object | Body, year, jurisdiction. Empty if the estimator did not cite one. |
| exclusion | string[] | Explicit exclusions. Do not infer extras. |
| change | object | Driver, claimed cost band, status: proposed or disputed or accepted. |
| source_doc | enum | takeoff_table, bid_form, rfi_recap, change_narrative. Not 'full plan set'. |
Compliance
Out of scope
Next step